Safety planning belongs inside the production plan.

Temporary structures, overhead work, electrical distribution, moving equipment, cable paths, vehicles, crews, presenters, and audiences all share the same site. We identify the applicable requirements, assign responsibilities, and build the communication and escalation path into the operating plan.

Planning categories

Safe delivery begins while the room and work are still being designed.

The applicable codes, venue requirements, client standards, credentials, engineering, permits, accessibility needs, and approval owners vary by engagement. The production plan identifies what applies and who is responsible.

01 / SAFETY
Site

Site planning and crew communication

Site orientation, crew briefings, hazard reporting, work-zone control, stop-work authority, and escalation are defined with the venue for the engagement.

  • Briefed
  • Accountable
02 / SAFETY
Power

Electrical design and responsibility

Service tie-in, distribution, grounding, protection, cable paths, inspection, and responsible electrical personnel are confirmed for the venue and scope.

  • Designed
  • Responsibility assigned
03 / SAFETY
Life safety

Life safety and accessibility

Egress, occupancy, fire-rated materials, accessibility, sightlines, seating, and emergency access are coordinated with the venue, client, and responsible specialists.

  • Egress
  • Audience access
04 / SAFETY
Practice

Technical guidance and engineering

Applicable event-safety guidance, technical standards, manufacturer requirements, venue rules, and engineering review are identified for the systems and work being performed.

  • Current guidance
  • Technical review
05 / SAFETY
Rigging

Qualified rigging and venue approval

Flown elements require appropriate design, load information, venue approval, qualified personnel, and the credentials required by the venue and jurisdiction.

  • Load information
  • Qualified personnel
06 / SAFETY
Management

Documented safety responsibilities

Safety responsibilities, hazard reporting, incident response, documentation, and review are assigned for the engagement.

  • Owned
  • Documented
02 · How a show stays safe

From advance through strike, responsibilities stay visible.

The client, venue, Space City Pro, contractors, and qualified specialists may each own different parts of the plan. Those responsibilities, interfaces, and critical procedures are established and communicated before the work begins.

  • Pre-event review. Venue requirements, site conditions, structural and rigging information, electrical responsibilities, access, schedule, and known hazards are reviewed.
  • Emergency procedures. Weather, evacuation, medical response, communications, authority, and stop-show decisions are coordinated with the venue and client.
  • Load-in controls. Crew briefings, work zones, overhead work, cable paths, equipment movement, access, and venue interfaces are planned for the site and schedule.
  • Show-day escalation. The responsible leads, communications path, stop-work authority, and escalation process are confirmed before doors and maintained through strike.
03 · FOR PROCUREMENT

Share the supplier-onboarding and safety requirements early. We will identify available records, engagement-specific documentation, responsible owners, dependencies, and response timing. For information on sustainability, see here.

See the procurement pack →
Plan safety with the program

Bring the safety requirements into the first planning conversation.

Send the relevant client, venue, and risk requirements. We will identify Space City Pro’s responsibilities, available documentation, and the items that require venue, client, engineering, legal, or specialist ownership.

SAFETY
Start with the brief, site requirements, or safety questionnaire.
Discuss your program → Procurement & credentials →
OSHA · NEC · NFPA · ADA · ESA · ANSI/ESTA · ETCP